A kitchen under renovation, cabinets covered with sheeting

Construction and Renovation

From building on your own plot to refurbishing an existing flat: planning the work, choosing the contractor and supervising the site.

  • The site survey and the schedule of works
  • Establishing whether a permit is required
  • Collecting and comparing tenders
  • The contract and the payment schedule
  • Photographic site reports

How we carry this service out

The steps describe what the work covers, not the order it follows.

People studying project drawings spread across a table

What happens at the start

A survey on site comes first: the condition of the existing structure, whether the load-bearing frame will be touched and whether the services need renewing. A price given without that survey is not an estimate but a wish; most of the surprises that appear once work has begun come from skipping it.

An architectural drawing inside a folder

Permits and consents

Work that touches the load-bearing structure or changes the number of units needs a permit from the municipality; painting and renewing a kitchen or bathroom usually does not. In a managed development the management plan and a decision of the owners also come into play. Which work needs which consent varies by municipality and building class, so the process is handled project by project.

A tradesman working with a mitre saw indoors

Choosing the contractor and the contract

Tenders are compared line by line on the same schedule of works; choosing between two tenders of different scope on price alone is the commonest reason the cheaper one turns out dearer. The programme, the payment schedule and the handover terms are written into the contract.

Contact

Let us talk about your own situation and settle in conversation what you actually need.